The current position:Home > Industry
manufacturing process the corrugated metal pipe
Time:2015-09-04 14:47
In the farm field irrigation, mining, oil depot, pumping sand, sand blasting, food, medical drugs and indoor gas, dust emission face, reference is widely used. The production process of welding corrugated metal culvert pipe according to the production of corrugated culvert pipe diameter size can be divided into two kinds of process route.
1 in large diameter corrugated production culvert, take welding inner ring sewing process route semi-circular clamp rings after this.
2 in the production of small diameter corrugated culvert pipe, inner ring seam welding process route taken before the whole process of ring back.
The product is the best substitute for product PVC, rubber, metal pipe. Welding after check inspection accords with the standard, you can through the mouth ring out at the process. Process of ring with red copper wire made of ordinary. Each process can only be used once. This is the difference between it and the main clamp ring.
The latest case
- requirements of corrugated ste
- key points of designing corrug
- manufacturing process the corr
- Several terms of corrugated pi
- identify the service life of t
- Characteristics and applicatio
- What is steel corrugated pipe
- Design and calculation method
The latest news
- Introduction of Qijia company
- visitation of the Hengshui Development Zone govern
- photos of Korea from CEO Cao
- Indonesia customer came to our company for inspect
- To serve the motherland
- In 2014 the Qijia afforestation campaign
- 2014 New Year's Day party
- Beautiful company environment
- Foreign customers visit
- Qijia group in 2013 New Year's Day Photo